5 marla Grey structure cost in Lahore 2025

5 marla Grey structure cost in Lahore 2025

In this blog we will discuss about 5 marla grey structure cost in Lahore 2025.

Total cost is 56.51 Lac

  • Plumbing Works6.63 Lac
  • Electrical Works1.46 Lac
  • Foundation & Structure48.42 Lac

Plumbing Works=6.63 Lakh

 

AC Drainage System=14.8 Thousand

ITEM RATE QUANTITY COST
1″ dia Class “E” 108/Rft. 137 14,796

 

Cold and Hot Water Supply=50.36 Thousand

ITEM RATE QUANTITY COST
25 mm o/d Pipe 105/Rft. 203 21,315
32 mm o/d Pipe 172/Rft. 81 13,932
40 mm o/d Pipe 263/Rft. 20 5,260
50 mm o/d Pipe 394/Rft. 25 9,850

 

Drainage System Piping=68.81 Thousand

ITEM RATE QUANTITY COST
2″ Dia. Pipe 255/Rft. 81 20,655
3″ Dia. Pipe 343/Rft. 81 27,783
4″ Dia. Pipe 167/Rft. 122 20,374

 

Gas Piping=64.63 Thousand

ITEM RATE QUANTITY COST
GI Welded Pipeline 3/4” i/d 408/Rft. 152 62,016
Gas Cock 3/4″ i/d 1309/Unit 2 2,618

 

Insulation Armaflex=33.24 Thousand

ITEM RATE QUANTITY COST
32 mm o/d 443/Rft. 41 18,163
50 mm o/d 603/Rft. 25 15,075

 

Pumps and Drains=3.06 Lakh

ITEM RATE QUANTITY COST
Booster Pump 0.75 HP 151961/Unit 1 151,961
Submersible Water Transfer Pump 1 HP 142647/Unit 1 142,647
Floor Drains 1676/Unit 7 11,732

 

UPVC Pipeline for Sewerage System=35.7 Thousand

ITEM RATE QUANTITY COST
6″ dia Class “B” 700/Rft. 51 35,700

Electrical Works=1.46 Lakh

 

Conduits & Accessories=48.37 Thousand

ITEM RATE QUANTITY COST
3/4” dia. Electrical PVC Conduit with accessories 29/Rft. 1013 29,377
1” dia. Electrical PVC Conduit with accessories 30/Rft. 304 9,120
1.5” dia. Electrical PVC Conduit with accessories 40/Rft. 35 1,400
2” dia. Electrical PVC Conduit with accessories 49/Rft. 41 2,009
PVC Ceiling Fan Hook 539/Unit 12 6,468

 

Switches and Back Boxes=32.71 Thousand

ITEM RATE QUANTITY COST
Switch Boards 1363/Board 24 32,712

Foundation & Structure=48.42 Lakh

 

Bricks, Cement, Sand, & Crush=31.91 Lakh

ITEM RATE QUANTITY COST
Bricks + Rorhi 27/Unit 56262 1,519,074
Cement 1350/Bag 605 816,750
Sand 195/Cft. 3025 589,875
Crush 154/Cft. 1721 265,034

 

Excavation & Steel Reinforcement=7.71 Lakh

ITEM RATE QUANTITY COST
Excavation & Backfill + Ghassu 22/Cft. 3696 81,312
Steel Reinforcement 230000/Tonne 3 690,000

 

Roof Insulation, Termite & Water Proofing=60.32 Thousand

ITEM RATE QUANTITY COST
Roof Insulation 244/Sft. 146 35,624
Termite Proofing 1668/Liter 5 8,340
Water Proofing 112/Sft. 146 16,352