Building a 10 Marla house in Karachi involves meticulous planning, significant investment, and an understanding of various construction costs. This guide provides a comprehensive breakdown of the construction costs, covering everything from the grey structure to the final finishing touches. The total estimated cost for constructing a 10 Marla house in Karachi stands at approximately 1.51 Crore PKR. This cost includes material expenses, labor charges, and detailed expenditures for different aspects of construction.
Total Construction Cost Overview
The total cost to construct a 10 Marla house in Karachi is approximately 1.51 Crore PKR. This figure includes the costs for both the grey structure and the finishing materials, as well as labor costs. Below is a detailed breakdown:
- Grey Structure Material Cost: 72.65 Lakh PKR
- Finishing Material Cost: 63.03 Lakh PKR
- Labor Cost: 15.15 Lakh PKR
The price per square foot comes to approximately 4,469 PKR.
Foundation & Structure
Foundation & Structure: 75.56 Lakh PKR
The foundation and structure of the house form the core of the building, ensuring its stability and durability. This stage includes materials and labor for the basic house structure, covering the foundation, floors, walls, roofing, and plastering.
-
Bricks, Cement, Sand, & Crush: 47.53 Lakh PKR
- Bricks + Rorhi: 26 PKR/Unit, Quantity: 97,559, Total: 2,536,534 PKR
- Cement: 1278 PKR/Bag, Quantity: 1049, Total: 1,340,622 PKR
- Sand: 85 PKR/Cft, Quantity: 5245, Total: 445,825 PKR
- Crush: 150 PKR/Cft, Quantity: 2869, Total: 430,350 PKR
-
Roof Insulation, Termite & Water Proofing: 1.02 Lakh PKR
- Roof Insulation: 249 PKR/Sft, Quantity: 243, Total: 60,507 PKR
- Termite Proofing: 1700 PKR/Liter, Quantity: 8, Total: 13,600 PKR
- Water Proofing: 114 PKR/Sft, Quantity: 243, Total: 27,702 PKR
-
Excavation & Steel Reinforcement: 14.52 Lakh PKR
- Excavation & Backfill + Ghassu: 25 PKR/Cft, Quantity: 6159, Total: 153,975 PKR
- Steel Reinforcement: 259560 PKR/Tonne, Quantity: 5, Total: 1,297,800 PKR
-
Labor Cost: 12.49 Lakh PKR
The foundation and structure cost encompasses the critical materials needed to construct the basic framework of the house. Bricks, cement, sand, and crush form the primary elements for walls and floors. Additionally, essential protective measures like roof insulation, termite proofing, and waterproofing ensure the house’s longevity and resistance to natural elements. The excavation and steel reinforcement provide the necessary support to bear the weight of the structure, making it safe and robust.
Plumbing Works
Plumbing Works: 9.70 Lakh PKR
Plumbing is an essential part of house construction, involving the installation of water supply systems, drainage systems, and gas piping. Effective plumbing ensures the smooth flow of water and gas throughout the house, contributing to the overall functionality and comfort.
-
Cold and Hot Water Supply: 85.38 Thousand PKR
- 25 mm o/d Pipe: 107 PKR/Rft, Quantity: 338, Total: 36,166 PKR
- 32 mm o/d Pipe: 172 PKR/Rft, Quantity: 135, Total: 23,220 PKR
- 40 mm o/d Pipe: 268 PKR/Rft, Quantity: 34, Total: 9,112 PKR
- 50 mm o/d Pipe: 402 PKR/Rft, Quantity: 42, Total: 16,884 PKR
-
Insulation Armaflex: 56.91 Thousand PKR
- 32 mm o/d: 457 PKR/Rft, Quantity: 68, Total: 31,076 PKR
- 50 mm o/d: 615 PKR/Rft, Quantity: 42, Total: 25,830 PKR
-
Drainage System Piping: 1.81 Lakh PKR
- 2″ Dia. Pipe: 265 PKR/Rft, Quantity: 135, Total: 35,775 PKR
- 3″ Dia. Pipe: 355 PKR/Rft, Quantity: 135, Total: 47,925 PKR
- 4″ Dia. Pipe: 480 PKR/Rft, Quantity: 203, Total: 97,440 PKR
-
Gas Piping: 1.09 Lakh PKR
- GI Welded Pipeline 3/4” i/d: 416 PKR/Rft, Quantity: 253, Total: 105,248 PKR
- Gas Cock 3/4″ i/d: 1335 PKR/Unit, Quantity: 3, Total: 4,005 PKR
-
Pumps and Drains: 3.21 Lakh PKR
- Booster Pump 0.75 HP: 155,000 PKR/Unit, Quantity: 1, Total: 155,000 PKR
- Submersible Water Transfer Pump 1 HP: 145,500 PKR/Unit, Quantity: 1, Total: 145,500 PKR
- Floor Drains: 1710 PKR/Unit, Quantity: 12, Total: 20,520 PKR
-
AC Drainage System: 25.08 Thousand PKR
- 1″ dia Class “E”: 110 PKR/Rft, Quantity: 228, Total: 25,080 PKR
-
UPVC Pipeline for Sewerage System: 59.98 Thousand PKR
- 6″ dia Class “B”: 714 PKR/Rft, Quantity: 84, Total: 59,976 PKR
-
Labor Cost: 1.32 Lakh PKR
Plumbing works encompass the installation of pipes for water supply and drainage, ensuring that every area of the house receives adequate water flow and has efficient waste disposal systems. This section also includes gas piping for kitchen and heating purposes, making the house fully functional and comfortable for daily living. Proper insulation and the use of high-quality materials prevent leaks and maintain the integrity of the plumbing system.
Electrical Works
Electrical Works: 13.04 Lakh PKR
Electrical installations are crucial for powering the house and ensuring safety. This category covers underground wiring, electrical fittings, lighting fixtures, and other essential components required for a reliable electrical system.
-
Grey Structure: 2.14 Lakh PKR
-
Finishing: 10.9 Lakh PKR
-
Switches and Back Boxes: 2.03 Lakh PKR
- Power Sockets: 1475 PKR/Socket, Quantity: 14, Total: 20,650 PKR
- Fan Dimmer: 1240 PKR/Dimmer, Quantity: 9, Total: 11,160 PKR
- Universal Switch Socket: 625 PKR/Socket, Quantity: 28, Total: 17,500 PKR
- Telephone Sockets (RJ-11): 595 PKR/Socket, Quantity: 2, Total: 1,190 PKR
- Distribution Board: 110,741 PKR/Unit, Quantity: 1, Total: 110,741 PKR
- TV Sockets: 495 PKR/Socket, Quantity: 6, Total: 2,970 PKR
- Switch Boards: 1390 PKR/Board, Quantity: 28, Total: 38,920 PKR
-
Conduits & Accessories: 80.31 Thousand PKR
- 3/4” dia. Electrical PVC Conduit with accessories: 30 PKR/Rft, Quantity: 1688, Total: 50,640 PKR
- 1” dia. Electrical PVC Conduit with accessories: 32 PKR/Rft, Quantity: 506, Total: 16,192 PKR
- 1.5” dia. Electrical PVC Conduit with accessories: 41 PKR/Rft, Quantity: 59, Total: 2,419 PKR
- 2” dia. Electrical PVC Conduit with accessories: 50 PKR/Rft, Quantity: 68, Total: 3,400 PKR
- PVC Ceiling Fan Hook: 547 PKR/Unit, Quantity: 14, Total: 7,658 PKR
-
Wires & Cables: 6.08 Lakh PKR
- 1.5mm Sq. (3/.029) PVC insulated Cu.conductor wire (Light point wiring): 4944 PKR/Coil, Quantity: 20, Total: 98,880 PKR
- 2.5mm Sq. (7/.029)PVC insulated Cu. conductor wire “Circuit wiring (Normal & UPS) & sockets Split AC: 7931 PKR/Coil, Quantity: 20, Total: 158,620 PKR
- 4mm Sq. PVC insulated Cu. Conductor wire (Power Sockets wiring) Split AC: 12360 PKR/Coil, Quantity: 10, Total: 123,600 PKR
- Four core 16 mm Sq. PVC insulated Cu. conductor cable (From DB-GF to wapda Energy Meter): 1494 PKR/Rft, Quantity: 70, Total: 104,580 PKR
- Cat 5 for Telephone Cable: 376 PKR/Rft, Quantity: 84, Total: 31,584 PKR
- TV Coaxial Cable for TV cable: 357 PKR/Rft, Quantity: 253, Total: 90,321 PKR
-
Lights, Fans and Chandeliers: 2.78 Lakh PKR
- Boundary Wall lights: 1723 PKR/Light, Quantity: 2, Total: 3,446 PKR
- Porch Lights: 1723 PKR/Light, Quantity: 4, Total: 6,892 PKR
- Bedroom Lights: 1353 PKR/Light, Quantity: 16, Total: 21,648 PKR
- Bathroom Lights: 1353 PKR/Light, Quantity: 10, Total: 13,530 PKR
- Open Area Lights: 1353 PKR/Light, Quantity: 20, Total: 27,060 PKR
- Kitchen Lights: 3500 PKR/Light, Quantity: 8, Total: 28,000 PKR
- Stair Case Lights: 1400 PKR/Light, Quantity: 6, Total: 8,400 PKR
- Drawing Room Lights: 4000 PKR/Light, Quantity: 4, Total: 16,000 PKR
- Living Area Lights: 4000 PKR/Light, Quantity: 8, Total: 32,000 PKR
- Ceiling Fans: 9500 PKR/Fan, Quantity: 9, Total: 85,500 PKR
- Exhaust Fans: 5100 PKR/Fan, Quantity: 7, Total: 35,700 PKR
-
Labor Cost: 1.35 Lakh PKR
Electrical works are critical for the safety and functionality of the house. This stage involves installing a comprehensive wiring system, switches, back boxes, and distribution boards. Properly placed lights, fans, and chandeliers enhance the aesthetic appeal and comfort of the home. Using high-quality wires and conduits ensures the electrical system’s longevity and reduces the risk of electrical faults.
Wood, Metal and Tile Works
Wood, Metal and Tile Works: 46.61 Lakh PKR
This category includes all wooden, metal, and tile works that contribute to the house’s aesthetic appeal and functionality. It encompasses the installation of cabinets, wardrobes, flooring, and various aluminum and iron works.
-
Paint and Ceiling Works: 9.49 Lakh PKR
- False Ceiling: 130 PKR/Sft, Quantity: 1013, Total: 131,690 PKR
- Paint: 57 PKR/Sft, Quantity: 14,344, Total: 817,608 PKR
-
Tile Work: 20.98 Lakh PKR
- Floor Tiles: 310 PKR/Sft, Quantity: 4280, Total: 1,326,800 PKR
- Floor Skirting: 271 PKR/Sft, Quantity: 1496, Total: 405,416 PKR
- Ceramic Tiles on Walls & Dado: 289 PKR/Sft, Quantity: 1267, Total: 366,163 PKR
-
Wooden Doors: 5.81 Lakh PKR
- Main Entrance Door: 101,701 PKR/Door, Quantity: 1, Total: 101,701 PKR
- Room Doors: 38,420 PKR/Door, Quantity: 5, Total: 192,100 PKR
- Washroom and Other Doors: 28,765 PKR/Door, Quantity: 7, Total: 201,355 PKR
- Roof and Terrace Doors: 28,765 PKR/Door, Quantity: 3, Total: 86,295 PKR
-
Windows: 2.1 Lakh PKR
- Aluminium Room Windows: 20,340 PKR/Window, Quantity: 7, Total: 142,380 PKR
- Aluminium Bathroom Windows: 13,560 PKR/Window, Quantity: 5, Total: 67,800 PKR
-
Metal Works: 2.96 Lakh PKR
- Staircase and Terrace Railing: 1605 PKR/Rft, Quantity: 100, Total: 160,500 PKR
- Main Gate: 135,602 PKR/Unit, Quantity: 1, Total: 135,602 PKR
-
Wardrobes & Cabinets: 5.25 Lakh PKR
- Wardrobes: 77,632 PKR/Unit, Quantity: 4, Total: 310,528 PKR
- Kitchen Cabinets: 107,351 PKR/Unit, Quantity: 2, Total: 214,702 PKR
Wood, metal, and tile works are essential for the interior design and functionality of the house. High-quality paint and ceiling works enhance the aesthetic appeal, while durable tiles provide a sleek and easy-to-maintain flooring option. Wooden doors and aluminum windows offer security and style. Metal works, including railings and gates, add a touch of elegance and safety. Custom wardrobes and kitchen cabinets maximize storage space and improve the overall functionality of the living areas.
Fittings & Fixtures
Fittings & Fixtures: 5.92 Lakh PKR
Fittings and fixtures encompass all the essential accessories required in the kitchen and bathrooms. This category ensures that the house is equipped with necessary amenities for daily use, contributing to the overall convenience and comfort of the residents.
-
Kitchen: 56.1 Thousand PKR
- Kitchen Sink: 13,500 PKR/Sink, Quantity: 2, Total: 27,000 PKR
- Sink Mixer: 11,300 PKR/Mixer, Quantity: 2, Total: 22,600 PKR
- Gully Trap Chamber: 3,249 PKR/Unit, Quantity: 2, Total: 6,498 PKR
-
Bathroom: 4.82 Lakh PKR
- Water Closet: 21,696 PKR/Unit, Quantity: 5, Total: 108,480 PKR
- Vanity Basin: 13,575 PKR/Basin, Quantity: 5, Total: 67,875 PKR
- Basin Mixer: 12,200 PKR/Mixer, Quantity: 5, Total: 61,000 PKR
- Muslim Shower: 2,830 PKR/Unit, Quantity: 5, Total: 14,150 PKR
- Shower Set: 36,160 PKR/Unit, Quantity: 5, Total: 180,800 PKR
- Toilet Paper Holder: 1,356 PKR/Unit, Quantity: 5, Total: 6,780 PKR
- Beveled Edge Mirror: 7,040 PKR/Mirror, Quantity: 5, Total: 35,200 PKR
- Soap Dish: 1,083 PKR/Dish, Quantity: 7, Total: 7,581 PKR
-
Geyser & Manhole: 54.28 Thousand PKR
- Geyser: 32,500 PKR/Unit, Quantity: 1, Total: 32,500 PKR
- Manhole: 5,445 PKR/Unit, Quantity: 4, Total: 21,780 PKR
Fittings and fixtures are the final touches that make a house ready for occupation. High-quality kitchen sinks, mixers, and bathroom accessories ensure that all facilities are functional and user-friendly. Proper installation of geysers and manholes adds to the overall convenience and safety of the house. These elements are crucial for daily living, providing essential utilities and enhancing the quality of life.
Conclusion
Constructing a 10 Marla house in Karachi requires a significant investment, meticulous planning, and attention to detail. The total estimated cost of 1.51 Crore PKR covers all aspects of construction, from the grey structure to the final finishing touches. By understanding the detailed breakdown of costs, homeowners can better manage their budget and ensure a successful construction project. Whether it’s the foundation, plumbing, electrical works, wood and tile works, or fittings and fixtures, each component plays a vital role in creating a comfortable, functional, and aesthetically pleasing home.
Frequently Asked Question
Who Is The Best Home Builder in Pakistan?
Wazir and Sons aims to be one of the best construction companies in Pakistan. We put all our determinations into our client’s work and tributes to be an inordinate service and construction company in Lahore.
Is It Cheaper To Build Or Buy a House in Pakistan?
While you’re planning for a new home, a constructed house is far more expensive than building the same house according to your own choice. However, Wazir and Sons offers you the market beating rates for both, whether you want to buy or you want to build your own customized dream home.
How Fast Can You Build A Small House in Pakistan?
A small house approximately takes 2 to 3 months’ time. Our architects are experienced professionals who understand client’s demands and efficiently meet client’s potentials.
How does Wazir and Sons stand out among construction companies in Lahore?
Wazir and Sons stands out in Lahore’s construction industry due to its unwavering commitment to quality, timely delivery, and client satisfaction. Our team’s expertise, attention to detail, and innovative approach make us a trusted choice for construction projects in Lahore.
What factors should I consider when selecting construction companies in Pakistan for my project?
When choosing construction companies in Pakistan, it’s crucial to consider factors such as experience, reputation, project portfolio, and compliance with quality standards. Look for companies with a proven track record and positive client feedback to ensure a successful project outcome.
Can You Build A House In 3 Months in Pakistan?
Yes, with the efficient team effort, Wazir and Sons being the best construction company in Lahore feels proud to tell you that a house can be built in three months under the construction of our expert skills.
What sets Wazir and Sons apart from other grey structure companies in Lahore?
Wazir and Sons distinguishes itself through a combination of experience, innovation, and a dedicated team. Our focus on delivering exceptional quality in grey structure construction, timely project completion, and transparent communication with clients sets us apart. Choose Wazir and Sons for a seamless and reliable grey structure construction experience in Lahore.
Why do overseas Pakistanis trust Wazir and Sons Pakistan?
Overseas Pakistanis trust Wazir and Sons because we never compromise on quality. We offer a 100-year guarantee on structural design and a comprehensive 5-year warranty, ensuring peace of mind for our clients. Our commitment to excellence and our track record of satisfied customers, especially among overseas Pakistanis, makes us their top choice.
In which countries does Wazir and Sons have satisfied customers?
Wazir and Sons has satisfied customers in various countries, including the United States, Dubai, Saudi Arabia, Gulf, United Arab Emirates, Germany, Australia, Canada, and several European nations. Our commitment to quality and our strong guarantees have earned us the trust of clients worldwide, especially among overseas Pakistanis residing in these regions.
Cement required for 1 kanal house?
A 1 kanal house in Pakistan requires around 1,600 bags of cement, at a cost of around PKR
23,88,000.
Other materials required for building a 1 kanal house include:
Kassu
A mixture of sand and mitti, used to fill empty plots and build the foundation. Around PKR 450,000 worth of Kassu is required.
Steel
Around 9 tons or 9,000 kg of 60 grade steel is required. &
You can use a house construction cost calculator to estimate the cost of building your home. You can enter the city, the area of the house, and the quality of materials you want to use.